Bell hole for new gas service

Bell hole for new gas service

This project involved digging a bell hole so the customer could install a new gas service.

s

The Challenges

This job required 280 feet of hose because the field was too muddy to drive in. The soil was a lot of rocks and tree roots which made for unsafe mechanical digging.

Project Successes

It’s a slow process with all the rocks and hard soil but the foreman specifically asked if I was for sure coming back, which sounds that he was happy with our work!

Personel

Paul W, Sean R

Case Study IMAGE GALLERY